Jeco Construction , a leader in the residential, commercial or townhouses  area
since We have completed time and material projects that take as little as two hours
to multi-million pesos expansion projects which span years. Because the needs of
our clients are so vastly different from one another, we have gained considerable
expertise in each of the following types of contracting:
Design-Build Construction,
Competitive Bid, Post-Build Services/Maintenance, Pre-engineered Metal
Building Construction.

Select the type of contracting services you are interested in learning more about and
contact Jeco Construction  to discuss your project in more detail.

•Design / Build
Design and construction services. It is often called a "turn-key" contract. The design-
build approach replaces the traditional method of awarding separate contracts for
design and for construction. On a design-build job the contractor and
architect/engineer are allied and work together to serve the owner. The owner,
contractor, and architect/engineer work as a TEAM to design and build a project
that satisfies the needs of the owner. The TEAM approach eliminates the tendency
to "blame the other guy" if a discrepancy occurs. Team members focus on solving
problems rather than placing blame.

•Architectural / Engineering
We offer architectural/engineering expertise which is one reason we are able to
give you such complete services. With this service we bring design and
architectural expertise in from the beginning, working to coordinate structural
necessities, cost, and aesthetic appeal into a building you'll be proud to own. The
services of Jeco Construction is always available to suit your project needs.

Competitive Bid :
The owner selects an architect/engineer to accurately and clearly describe the
project and all requirements in plans, specifications and bid documents. The
contractor is chosen by one of three methods:

Hard Bid:
The owner advertises for bidders and accepts the bid of the lowest qualified bidder.

Select Bid:
The owner, often based on the architect/engineer's recommendation, selects a group
of contractors to bid on the project. The lowest qualified bid is usually accepted.

Negotiated Bid:
The owner negotiates with one or more contractors and chooses the contractor he
feels is the best for the project. The selection is usually based on CONFIDENCE,
TRUST AND RELATIONSHIP.

•Post Build Services / Maintenance
Post build services and maintenance are usually negotiated contracts with particular
owners which may encompass an entire plant or facility wide maintenance program
or small one-time job orders as required by the owner. Usually these services are
accompanied by mutually agreed upon time and material labor rates for all potential
crafts and set fees for subcontracts, materials and equipment. These types of
contracts work best for owners who may not have the need for a full time
maintenance staff with a multitude of abilities. An example of this might include
small retail stores, restaurants or light commercial endeavors. The extreme opposite
may be a large manufacturing or industrial facility with large continuing and
preventative maintenance needs that becomes burdensome to their regular
maintenance staff because of the manpower ups and downs.

•Pre-Engineered Metal Buildings
Pre-Engineered Metal Buildings is a specific type of construction but has steadily
grown into a specialized avenue for owners to be in a facility very quickly. Whether
it be a small retail store or a 500,000 square foot manufacturing facility or
warehouse, pre-engineered metal buildings offer both an economical benefit and a
timely schedule for occupancy. Pre-engineered metal buildings can be designed and
built to look like any conventional structure imaginable; however, the benefit of
being pre-engineered loses its advantages with both schedule and cost when the
project is of intricate or unusual design.

•Construction Management
The Construction Management Association of America defines construction
management as management activities over and above normal architectural and
engineering services conducted during the predesign, design, and construction
phases, that contribute to the control of time and cost. The owner selects a
construction manager and architect/engineer to act as a design and support team to
assist, advise, and inspect during the construction of the project. An owner may
choose one of two methods of construction management: construction management
with a general contractor or construction management with no general contractor.

Using the construction management with no general contractor, the owner hires a
construction manager on a fee basis to assist them in acting as their own general
contractor. The owner then signs contracts with multiple subcontractors. When an
owner selects this method of contracting, they may save money, but they also
assume more risk.

The construction management with a general contractor is usually used when the
project is complex, very large or the owner puts a high priority on getting a top
quality job. The owner does not need experience and knowledge of construction if
he chooses competent team members. The owner may contract with one or more
general contractors by negotiation, select bid, or hard bid, thus creating as few as
three direct contracts (i.e. construction manager, architect/engineer, general
contractor).
Services
Office Address :
819 Antonio
Maceda St
  Sampaloc, Manila
  Philippines